धोलेरा, गुजरात में भारत की पहली सेमीकंडक्टर निर्माण सुविधा स्थापित करने की अनुमानित लागत क्या है , What is the estimated cost of setting up India’s first semiconductor fabrication facility in Dholera, Gujarat
What is the estimated cost of setting up India’s first semiconductor fabrication facility in Dholera, Gujarat
A.
Rs 91,000 crore
Rs 91,000 crore
B.
Rs 76,000 crore
76,000 करोड़ रुपये
C.
Rs 27,000 crore
27,000 करोड़ रुपये
D.
Rs 7,500 crore
7,500 करोड़ रुपये
Solution
A. Rs 91,000 crore